How do you find the capacity constrained resource (CCR) in a straight flow line if workers are crowded together in a confined space? There is nowhere for WIP to pile up! Simply, place a buffer before a station(s). Soon, WIP can be seen in front of the CCR station. Furthermore, the maximum practical use of the most precious CCR can be carried out by placing a buffer before and after a CCR to isolate interference by non-CCRs. By doing that even for the already fully tuned TPS flow line, 60% of improvement in capability was attained in only six days as a result. It is interesting when management looked at this result, they enforced this technique one after another without hesitation and the production capacity of the whole factory has been improved in a short period of time. The good point of this technique does not need advanced technology.
What Will You Learn
To help you get the most value from this session, we’ve highlighted a few key points. These takeaways capture the main ideas and practical insights from the presentation, making it easier for you to review, reflect, and apply what you’ve learned.