The Project Management Simulator (PMSim) was developed by Eli Schragenheim to the request of Dr. Goldratt. The simulator has been designed in a way allowing demonstrating and explaining the flawed assumptions behind the Critical Path methodology and the way to overcome them through the Critical Chain planning and the executing methodology called CCPM. It uses several scenarios under varied assumptions regarding uncertainty and human behavior. The whole session is based on going through the simulator and viewing the results coming from multiple runs.

What Will You Learn

To help you get the most value from this session, we’ve highlighted a few key points. These takeaways capture the main ideas and practical insights from the presentation, making it easier for you to review, reflect, and apply what you’ve learned.

Plane

Instructor(s)

Eli Schragenheim

Eli Schragenheim is a well-known international management educator, author and consultant active in various fields of management. He worked with a huge variety of organizations all over the world, including public-sector organizations, industrial, high-tech and start-ups. Since he had joined Dr. Eliyahu M. Goldratt, the famous creator of the Theory of Constraints (TOC) in 1985, Eli Schragenheim had taught, spoke at conferences, and consulted all over the globe. Eli Schragenheim is the author of several books on various aspects of management. His last book, Throughput Economics – Making Good Management Decisions, together with Henry Camp and Rocco Surace, was published in July 2019. Eli Schragenheim first book Management Dilemmas (1998) showed a variety of problematic situations in management and the rigorous analysis leading to the right solution. Next he collaborated with William H. Dettmer in writing Manufacturing at Warp Speed. In this book the new concept of Simplified-DBR, now a key concept in production planning according to TOC, was introduced. He collaborated with Carol A. Ptak on ERP, Tools, Techniques, and Applications for Integrating the Supply Chain, and with Dr. Goldratt and Carol Ptak on Necessary but Not Sufficient. In 2009 his book Supply Chain Management at Warp Speed, with William H. Dettmer and Wayne Patterson was published. In March 2015, Eli has opened a blog, now containing more than 140 articles on various topics in TOC that everybody can access.

Become a Member Today

Ignite your TOC journey—gain powerful tools and insights, connect with a global network of innovators, and invest in your growth with everything TOCICO membership has to offer.